Please activate JavaScript!
Please install Adobe Flash Player, click here for download

2014 Compact

Conservation of nature and resources Objective: Reduction in consumption of drinking water due to higher service water usage in Terminal 1 (to 38 % of total quantity by 2016) and in the southern section of the airport* (50 % by 2020) Duration: 2016/2020 Measure Status Increase in service water usage in Terminal 1 and in the southern section of the airport* >> In Terminal 1: 70 % of bathroom facilities (238) in Terminal 1 have since been provided with service water. >> In the southern section: Service water usage for new air freight halls in CargoCity South planned to an appropriate extent (in the planning stages). Commissioning of the first air freight hall planned for 2015, further commissioning planned to follow in 2017. * This refers to the area to the south of the takeoff and landing runway 07R/25L. This is where CargoCity South, the southern development area for the future Terminal 3, and maintenance facilities, such as for Lufthansa, are located. Objective: Ensuring the sustainable management of forest areas on the land owned by the Fraport parent company Duration: 2015 Measure Status Certification of Fraport forest areas >> In the planning stages Objective: Reduction in consumption of de-icing agent (N*ICE Aircraft Services & Support GmbH) Duration: 2015 Measure Status Increase in remote de-icing using a new remote de-icing pad Testing of the forced air de-icing process >> Operational usability is being verified in a simulation. >> It was not possible to test any vehicles due to the mild winter in 2013/2014, and a new test is therefore planned for winter 2014/2015. Objective: Reduction in paper consumption (N*ICE Aircraft Services & Support GmbH) Duration: 2015 Measure Status Switch to paperless work orders and electronic invoicing >> The transition has taken place, with a steady rise in acceptance being detected on the part of the airlines. Objective: Improving structural diversity of up to 250 hectares Duration: 2015 Measure Status Introduction of twice-yearly mowing and/or strip mowing of the dry grassland in the southern parallel runway system and takeoff runway 18 west >> In the planning stages XISustainability Program 2014

Pages Overview